A hard update on the AirLeak Pro pre-orders, and an apology first.
I really don’t like extending the waiting time. You trusted me with your money and your patience, and asking for more of both is not something I take lightly. I’m genuinely sorry.
Here’s where things actually stand. Over the past couple of months the AirLeak Pro was fully redesigned with a new engineer on the hardware side — cleaner switch, straightforward USB path, pin mapping unchanged. In schematics, in layout, and in simulation, everything looked perfect. The design was signed off and prototypes were ordered.
The prototypes came back non-functional. Something went wrong in production, between the design that we validated and the physical board that arrived on the bench. That is genuinely painful to type, and it is exactly what happened.
We are not quitting. My engineer and I are working on it every day — no pauses, no drift onto other things — until we know exactly which production step failed, correct it, respin the board, and confirm the new prototypes work end to end. That is the only path I’m taking, and it’s the one that puts a working device in your hands rather than a half-working one.
I can’t honestly give you a hard ETA yet, and I refuse to invent one. What I can commit to, in writing, on a fixed calendar date: a working device by 18 December 2026. That is three months from this post (18 September 2026), and it is the ceiling — not the target. If we solve it earlier — and I want that more than anyone — you will hear it on this page and in Discord before anywhere else.
Your pre-order is safe. Nothing is canceled, nothing is re-queued, and the price you paid still stands. If the wait has become too long for you, message me and we’ll sort it out personally, refund included.
And please — if you have any question at all, don’t hesitate to write to us. About the board, about what we’re seeing on the bench, about your order, anything. I would much rather hear from you than have you sitting there wondering.